Applying the Mule-Hide EPDM Restoration System is
an easy 3-step process that lets crews finish EPDM restoration jobs in
record time for minimal disruption to building owners. Water based
and needs no fabric!
Give EPDM Roofs a Second Chance with a Mule-Hide
Second Skin
Seals sound EPDM roofs for like-new performance. [Must
first repair roof per NRCA guidelines]
Mule-Hide EPDM Restoration System™ ,
adds years to the life of existing EPDM Roofs.
Turns black EPDM into a "COOL ROOF" to
offer your customers energy savings while protecting the membrane
from the elements.
Energy Efficient Roofs- Mule-Hide white A-300 FINISH
has been independently
tested to EPA guidelines with results of initial solar reflectance
values up to 86% and 3 year aged values up to 72%; plus emissivity
values of 86.4%. Reflectivity
is the percentage of the sun’s heat a roof keeps off a building,
and emissivity is the percentage of heat a roof lets out of a building. Can
reduce surface temperatures and interior temperatures. For a building
to maximize an internal cool temperature, the roof must keep out a
high percentage of solar heat hitting it (reflectivity), and let out
a high percentage of the heat it has absorbed (emissivity).
3 Steps to coat an EPDM ROOF
Apply A-151 EPDM ReSurface Agent™
Power Rinse with water [Repair existing roof system
per NRCA guidelines]