Skip to content
PVC FRS

NEW-PRODUCT

Mule-Hide PVC FRS utilizes Fiberglass Reinforcing Scrim, which adds dimensional stability to the membrane. It is for use on adhered roofing systems and can be used on new construction, reroofing and recover (retrofit) applications. The system must be installed over an acceptable roof insulation or other suitable substrate.

System

PVC
  • Fiberglass Reinforced
  • 60, 80 mil thickness minimum
  • Fully adhered
  • Available in white, gray and tan
  • Up to a 25 year system warranty available
  • Can be installed with Hydrobond wet lay-in or solvent based contact adhesive
  • Pre-printed with lap lines and fastener spacing
  • Excellent chemical resistance, better solution for food service industry over TPO
  • More flexible and easier to work with than TPO
  • Will smoke when welding
  • Meets  FM Standards
  • Meets  Miami-Dade-County Standards
  • Meets  Florida-Building Standards
  • Meets  ICC-ES Standards

Documents

PDS - PVC FRS

Details

BASE ATTACHMENT PVC - ALL-PURPOSE BAR
PARAPET FLASHING FOR PVC

FIELD FABRICATED INSIDE CORNER FOR PVC
FIELD FABRICATED OUTSIDE CORNER FOR PVC
INSIDE CORNER WITH COATED METAL WALL FLASHING FOR PVC
PRE-MOLDED INSIDE CORNER FLASHING FOR PVC
PRE-MOLDED OUTSIDE CORNER FOR PVC
PRE-MOLDED OUTSIDE CORNER ON COATED METAL WALL FLASHING FOR PVC

CURB FLASHING FOR PVC
PVC COATED WALL FLASHING

PREMANUFACTURED CONDUCTOR HEAD
ROOF DRAIN - SUMPS SLOPED MORE THAN 3 inch PER FOOT FOR PVC
ROOF DRAIN - SUMPS SLOPED MORE THAN 3" PER FOOT - 1 OF 2
ROOF DRAIN - SUMPS SLOPED MORE THAN 3" PER FOOT - 2 OF 2
ROOF DRAIN FOR DRAIN SUMPS SLOPED LESS THAN 3 inch PER FOOT FOR PVC
ROOF DRAIN FOR DRAIN SUMPS SLOPED MORE THAN 3 inch PER FOOT FOR PVC

EXPANSION JOINT - DECK TO DECK
EXPANSION JOINT - DECK TO DECK FOR PVC
EXPANSION JOINT AT JUNCTION OF DECK AND WALL
EXPANSION JOINT AT JUNCTION OF DECK AND WALL FOR PVC

CONCRETE PAVER WALKWAY
MH-100 PVC Walkway

FIELD FABRICATED HOT PIPE FOR PVC
FIELD FABRICATED PIPE FLASHING FOR PVC
MEMBRANE COATED METAL PITCH PAN FOR PVC
MOLDED SEALANT POCKET FOR PVC
PREFABRICATED SQUARE TUBING WRAP FOR PVC
PVC PRE-MOLDED PIPE FLASHING
SLEEPER SUPPORT (HEAVY WEIGHT) FOR PVC - OPTION 2
SLEEPER SUPPORT (HEAVY WEIGHT) FOR PVC - OPTION 3
SLEEPER SUPPORT (LIGHT WEIGHT) FOR PVC - OPTION 1

ALL-PURPOSE BAR EDGE TERMINATION FOR PVC
COATED METAL BUTT JOINT FOR PVC
DRIP EDGE FOR ALL PVC SYSTEMS
EDGE TERMINATION - ALL-PURPOSE BAR FOR PVC
GUTTER TERMINATION FOR FLEECE BACK PVC
GUTTER TERMINATION FOR PVC

"T" JOINT COVER PATCH .060" (60 MIL) OR THICKER MEMBRANES
LAP CROSS SECTION FOR PVC - OPTION 1

CONCRETE PARAPET WALL WITH TERMINATION BAR FOR PVC
COPING STONE FOR PVC
CURB/WALL FLASHING WITH M-H ALL-PURPOSE BAR FOR PVC
METAL CAP TERMINATION FOR PVC
PREMANUFACTURED ARCHED COPING WITH SPLICE PLATE
PREMANUFACTURED METAL EDGE EXTENDER
PREMANUFACTURED REGLET COUNTERFLASHING
PREMANUFACTURED SURFACE MOUNTED COUNTERFLASHING
REGLET COUNTERFLASHING TERMINATION FOR PVC
SURFACE MOUNTED COUNTERFLASHING FOR PVC
TERMINATION BAR AT CORNER FOR PVC
TERMINATION BAR AT TILT-UP WALL JOINT FOR PVC
TERMINATION BAR FOR PVC
TERMINATION BAR WITH COUNTERFLASHING FOR PVC
TERMINATION ELEVATION CHANGE FOR PVC

COATED METAL TRANSITION TO SHINGLE ROOF FOR PVC
MEMBRANE FLASHING TRANSITION TO SHINGLE ROOF FOR PVC
TIE-IN TO EXISTING SINGLE PLY FOR PVC

Specifications

Specification - PVC / PVC KEE Fully Adhered
Summary Specification - PVC Fleece Back Systems Fully Adhered
Summary Specification - PVC Systems Fully Adhered

Guide - Equipment needed to install Heat-Welded Membranes

Options

Item ID Description Packaging Qty per Ctn Weight per Ctn Cover Rate
07MHPFR61W MH PVC FIBERGLASS REINFORCED 60 MIL MIN 10' x 100' WHITE 0 1,000 SF
07MHPFR61G MH PVC FIBERGLASS REINFORCED 60 MIL MIN 10' x 100' GRAY 0 1000 Sq. Ft/RL
07MHPFR61T MH PVC FIBERGLASS REINFORCED 60 MIL MIN 10' x 100' TAN 0 1000 Sq. Ft/RL
07MHPFR81W MH PVC FIBERGLASS REINFORCED 80 MIL MIN 10' x 75' WHITE 0 750 Sq.FT/RL
07MHPFR81G MH PVC FIBERGLASS REINFORCED 80 MIL MIN 10' x 75' GRAY 0 750 Sq. Ft/RL
07MHPFR81T MH FIBERGLASS REINFORCED 80 MIL MIN 10' x 75' TAN 0 750 Sq. Ft/RL

FAQs

To reduce blocking, packs should only be stacked 4-packs up to five high. We have found that when stacked higher, the bottom rolls could crush a bit which could create blocking and a wavy sheet when installed. It is possible that the stacking issue can be heightened over the summer months due to heat.