Skip to content
PVC FRS Fleece Back

NEW-PRODUCT

PVC FRS Fleece Back

Mule-Hide PVC FRS Fleece Back utilizes Fiberglass Reinforcing Scrim, which adds dimensional stability to the membrane. It is enhanced with fleece for added puncture resistance, and an exceptional bond with acceptable adhesives. It is for use on adhered roofing systems and can be used on new construction, refoofing and recover (retrofit) applications. The system must be installed over an acceptable roof insulation or other suitable substrate.

System

PVC
  • Fleece backing adds toughness, durability and enhanced puncture resistance
  • Fiberglass Reinforcement adds dimensional stability to the membrane
  • Use of low-volatility plasticizer
  • Enhanced chemical resistance to acids, bases, restaurants oils, fats, greases and acid rain
  • Low temperature flexibility
  • Excellent wind uplift resistance due to bond between fleece and adhesives
  • Meets  UL Standards
  • Meets  FM Standards
  • Meets  Miami-Dade-County Standards
  • Meets  Florida-Building Standards
  • Meets  ICC-ES Standards

Documents

PDS - PVC FRS FLEECE BACK

Details

BASE ATTACHMENT PVC - ALL-PURPOSE BAR
PARAPET FLASHING FOR PVC

FIELD FABRICATED INSIDE CORNER FOR PVC
FIELD FABRICATED OUTSIDE CORNER FOR PVC
PRE-MOLDED INSIDE CORNER FLASHING FOR PVC
PRE-MOLDED OUTSIDE CORNER FOR PVC

CURB FLASHING FOR PVC

EXPANSION JOINT - DECK TO DECK
EXPANSION JOINT - DECK TO DECK FOR PVC
EXPANSION JOINT AT JUNCTION OF DECK AND WALL
EXPANSION JOINT AT JUNCTION OF DECK AND WALL FOR PVC

FIELD FABRICATED HOT PIPE FOR PVC
FIELD FABRICATED PIPE FLASHING FOR PVC
MEMBRANE COATED METAL PITCH PAN FOR PVC
MOLDED SEALANT POCKET FOR PVC
PREFABRICATED SQUARE TUBING WRAP FOR PVC
PVC PRE-MOLDED PIPE FLASHING
SLEEPER SUPPORT (HEAVY WEIGHT) FOR PVC - OPTION 2
SLEEPER SUPPORT (HEAVY WEIGHT) FOR PVC - OPTION 3
SLEEPER SUPPORT (LIGHT WEIGHT) FOR PVC - OPTION 1

ALL-PURPOSE BAR EDGE TERMINATION FOR PVC
COATED METAL BUTT JOINT FOR PVC
DRIP EDGE FOR ALL PVC SYSTEMS
GUTTER TERMINATION FOR FLEECE BACK PVC
MEMBRANE COATED GRAVEL STOP FOR PVC

"T" JOINT COVER PATCH .060" (60 MIL) OR THICKER MEMBRANES
FLEECE BACK END LAPS FOR PVC

CONCRETE PARAPET WALL WITH TERMINATION BAR FOR PVC
COPING STONE FOR PVC
CURB/WALL FLASHING WITH COUNTERFLASHING FOR PVC
CURB/WALL FLASHING WITH M-H ALL-PURPOSE BAR FOR PVC
METAL CAP TERMINATION FOR PVC
PREMANUFACTURED ARCHED COPING WITH SPLICE PLATE
PREMANUFACTURED METAL EDGE EXTENDER
PREMANUFACTURED REGLET COUNTERFLASHING
SURFACE MOUNTED COUNTERFLASHING FOR PVC
TERMINATION BAR AT CORNER FOR PVC
TERMINATION BAR AT TILT-UP WALL JOINT FOR PVC
TERMINATION BAR FOR PVC
TERMINATION ELEVATION CHANGE FOR PVC

COATED METAL TRANSITION TO SHINGLE ROOF FOR PVC
MEMBRANE FLASHING TRANSITION TO SHINGLE ROOF FOR PVC
TIE-IN TO EXISTING SINGLE PLY FOR PVC

Specifications

Specification - PVC Systems - PVC Systems KEE Fully Adhered Fleece Back
Specification Supplement - AeroWeb Adhesive
Summary Specification - PVC Fleece Back Systems Fully Adhered
Summary Specification - PVC Systems Fully Adhered

Tech Note - Design Wind Speed vs Warranted Wind Speed

Options

Item ID Description Packaging Qty per Ctn Weight per Ctn Cover Rate
07MHPFR15W MY PVC FIBERGLASS REINFORCED 115 MIN 10' x 100' FLEECEBACK WHITE 0 1000 Sq. Ft/RL
07MHPFR15G MH PVC FIBERGLASS REINFORCED 115 MIN 10' x 100' FLEECEBACK GRAY 460 1000 Sq. Ft/RL
07MHPFR15T MH PVC FIBERGLASS REINFORCED 115 MIN 10' x 100' FLEECEBACK TAN 0 1000 Sq. Ft/RL
07MHPFR35W MH PVC FIBERGLASS REINFORCED 135 MIN 10' x 75' FLEECEBACK WHITE 0 750 Sq. Ft/RL
07MHPFR35G MH PVC FIBERGLASS REINFORCED 135 MIN 10' x 75' FLEECEBACK GRAY 0 750 Sq. Ft/RL
07MHPFR35T MH PVC FIBERGLASS REINFORCED 135 MIN 10' x 75' FLEECEBACK TAN 0 750 Sq. Ft/RL

FAQs

To reduce blocking, packs should only be stacked 4-packs up to five high. We have found that when stacked higher, the bottom rolls could crush a bit which could create blocking and a wavy sheet when installed. It is possible that the stacking issue can be heightened over the summer months due to the heat.