Skip to content
TPO with Clean Film

TPO with Clean Film

Is available with an optional CLEAN Film, a temporary protective film factory applied to the top surface of the membrane. By protecting the membrane surface from scuffs and dirt accumulation during installation, this protective film can save labor and time by helping to eliminate the need for roof cleaning upon project completion. CLEAN Film can be left in place for up to 90 days. Durable and easy to remove, CLEAN Film helps to improve the aesthetics and long-term reflectivity and is ideal for use on re-roofing, re-cover and new construction projects. CLEAN Film is available on TPO-c 60 mil membranes supplied in 6’ x100’ and 10’x100’rolls.

System

TPO
  • Polyester-reinforced
  • Available in 6' and 10' widths only
  • 60 mil thickness
  • Fully adhered and mechanically attached systems
  • Available in white, gray and tan
  • Most often installed as mechanically attached
  • Up to a 20 year system warranty available
  • All adhesives must be installed as a 2-sided contact adhesive
  • Pre-printed with lap lines and fastener spacing
  • Meets  UL Standards
  • Meets  C-UL Standards
  • Meets  FM Standards
  • Meets  CCMC Standards
  • Meets  Miami-Dade-County Standards
  • Meets  Florida-Building Standards
  • Meets  CRRC Standards
  • Meets  CA-Title-24 Standards
  • Meets  ICC-ES Standards

Documents

PDS - Standard TPO Membranes
SDS - Statement for Article Products

CCMC - Canadian Construction Materials Centre evaluation for TPO Systems
Florida Product Approval - TPO Systems
Florida Product Approval HVHZ - TPO Systems
ICC-ESR Report - Adhered and Mech. Attached EPDM Systems, TPO Systems & PVC Systems
ICC-ESR Report - Ballasted EPDM Systems and TPO Systems
Miami-Dade NOA - TPO Systems over Cement Wood Fiber
Miami-Dade NOA - TPO Systems over Concrete Deck
Miami-Dade NOA - TPO Systems over Gypsum
Miami-Dade NOA - TPO Systems over Light Weight Concrete
Miami-Dade NOA - TPO Systems over Steel Deck
Miami-Dade NOA - TPO Systems over Wood Deck
Miami-Dade NOA - TPO Systems Recover applications
TDI - Texas Department of Insurance - TPO Systems & PVC Systems MA over wood
TPO Membrane - EPD
UL - Impact resistance ratings for TPO Systems
UL - Overview of UL Listings for TPO Systems
UL - Summary of UL Listings for TPO Systems

Eight Reasons to Choose a TPO System
Hail Coverage - Procedures and Requirements
Letter of Compliance Application- Photovoltaic Installation on Mule-Hide Warranted Roof
Procedure for Inclusion of Photovoltaic Anchor Flashings
Reduced Fastener Requirements for Uplift Ratings
Single-Ply Roofing Accessories Guide
Talking Points - TPO with CLEAN Film
Tech Bulletin - Pactiv GreenGuard Insulation
TPO Cross Reference Chart
TPO Metal Retrofit
TPO Pocket Guide
TPO Systems Brochure

Design Enhancements - Single-Ply Membranes
Design Summary - TPO Fleece Back Systems 10 or 15 year Fully Adhered
Design Summary - TPO Systems 10 or 15 year Ballasted
Design Summary - TPO Systems 10 or 15 year Fully Adhered
Design Summary - TPO Systems 10 or 15 year Mechanically Attached
E-Z Commercial Warranty Application - Material Only
Warranty Program Information - Heat Weld Systems

Details

DUTCH GUTTER FOR EPDM AND TPO
INTERMITTENT WALL SCUPPER FOR EPDM
PREMANUFACTURED CONDUCTOR HEAD
ROOF DRAIN FOR EPDM AND TPO

4" TRAY PROFILE
TRANSITION TO WALKWAY
WALKWAY PAVER FOR EPDM AND TPO

HELIX FOAM ADHESIVE 4" RIBBON PATTERN
HELIX MAX FOAM ADHESIVE 12" RIBBON PATTERN
HELIX MAX FOAM ADHESIVE 4" RIBBON PATTERN
HELIX MAX FOAM ADHESIVE 6" RIBBON PATTERN

METAL RETROFIT - MEMBRANE COATED DRIP EDGE WITH GUTTER FOR TPO

METAL RETROFIT - 10 inch RUSS RIDGE SECUREMENT DETAIL FOR TPO
METAL RETROFIT - 10 inch RUSS STRIP MEMBRANE SECUREMENT FOR TPO
METAL RETROFIT - 100 MPH OR LESS WIDE SHEETS WITH SEAMS OVER PURLINS FOR TPO
METAL RETROFIT - 100 MPH OR LESS WIND ZONES MECHANICALLY ATTACHED SYSTEM FOR TPO - OPTION 1
METAL RETROFIT - 100 MPH OR LESS WIND ZONES MECHANICALLY ATTACHED SYSTEM FOR TPO - OPTION 2
METAL RETROFIT - 101-120 MHP WIND ZONES MECHANICALLY ATTACHED FOR TPO - OPTION 1
METAL RETROFIT - 101-120 MHP WIND ZONES MECHANICALLY ATTACHED FOR TPO - OPTION 2
METAL RETROFIT - 101-120 MHP WIND ZONES MECHANICALLY ATTACHED FOR TPO - OPTION 3
METAL RETROFIT - 101-120 MHP WIND ZONES MECHANICALLY ATTACHED FOR TPO - OPTION 4
METAL RETROFIT - 101-120 MHP WIND ZONES NARROW SHEETS WITH SEAMS OVER PURLINS
METAL RETROFIT - SEAM FASTENING NARROW ROLLS MEMBRANE SECUREMENT FOR TPO

PREMANUFACTURED ARCHED COPING WITH SPLICE PLATE
PREMANUFACTURED METAL EDGE EXTENDER
PREMANUFACTURED REGLET COUNTERFLASHING
PREMANUFACTURED SURFACE MOUNTED COUNTERFLASHING

SEGREGATION DETAIL/GREEN ROOF AND EXISTING ROOF
SEGREGATION DETAIL/GREEN ROOF AND EXPOSED SINGLE PLY

Specifications

Specification - TPO Fully Adhered
Specification Supplement - AeroWeb Adhesive
Summary Specification - TPO Systems Fully Adhered

Guide - Equipment needed to install Heat-Welded Membranes
Guide - Insulation Guidelines
Guide - Roof Mounted Photovoltaic Installations
Guide - TPO Systems Installation Guidelines
Single-Ply Insulation Attachment Guidelines
Tech Note - Design Wind Speed vs Warranted Wind Speed
Tech Note - Sheet Flutter on Mechanically Attached Systems

Specification - TPO Systems Induction Welding Attachment
Specification - TPO Systems Mechanically Attached
Summary Specification - TPO Systems Mechanically Attached
Summary Specification - TPO Systems metal retrofit using RUSS
Summary Specification - TPO Systems metal retrofit-purlin attached

Options

Item ID Description Packaging Qty per Ctn Weight per Ctn Cover Rate
07MHT611GC MH TPO 060 10X100 GRAY w/CLEAN FILM Shrink Wrap 1 330 1000 Sq.Ft/RL
07MHT611TC MH TPO 060 10X100 TAN w/CLEAN FILM Shrink Wrap 1 330 1000 Sq.Ft/RL
07MHT611WC MH TPO 060 10X100 WHITE w/CLEAN FILM Shrink Wrap 1 330 1000 Sq.Ft/RL
07MHT661GC MH TPO 060 6X100 GRAY w/CLEAN FILM Shrink Wrap 1 198 600 Sq.Ft/RL
07MHT661TC MH TPO 060 6X100 TAN w/CLEAN FILM Shrink Wrap 1 198 600 Sq.Ft/RL
07MHT661WC MH TPO 060 6X100 WHITE w/CLEAN FILM Shrink Wrap 1 198 600 Sq.Ft/RL

FAQs

To reduce blocking, packs should only be stacked 4-packs up to five high. We have found that when stacked higher, the bottom rolls could crush a bit which could create blocking and a wavy sheet when installed. It is possible that the stacking issue can be heightened over the summer months due to the heat.